List Your Equipment For Free  /  Seller Login

ALLU Launches New PROCESSOR at Shanghai Summit

Mon May 08, 2017 - National Edition
Construction Equipment Guide


The 7th China International Piling and Deep Foundations Summit was held from the 24th-26th of April in Shanghai. ALLU participated for the fifth time, holding a well-attended customer seminar. In addition to a full itinerary of events, a new addition to ALLU's range of mass stabilization equipment was unveiled – ALLU PROCESSOR.

The China International Piling and Deep Foundations Summit is the largest and most comprehensive piling and deep foundation event held in Asia. Its main focus is on cutting-edge technologies and solutions that have been developed to deliver successful construction techniques in pile foundation, exchange of piling and deep foundation engineering.

In order to provide an academic and practical outline of its solutions for businesses involved in these diverse areas, ALLU hosted a customer seminar during the Summit discussing such topics as:

• Mass stabilization – versatile ground improvement method

• The application and development of mass stabilization in China

• ALLU products for foundations, remediation and solidification

These talks were delivered by a team of industry experts, including:

• Baojian Wang, Area Sales Manager, ALLU China

• Fredrik Dromberg, Vice President, Process Equipment, ALLU Finland

• Prof. Leena Korkiala-Tanttu, Professor of Practice, Aalto University, Finland

• Prof. Chen Yonghui, HoHai University, Nanjing

The seminar was arranged as ALLU has established itself as an important supplier of equipment aimed at delivering transforming solutions for mass stabilization systems, mixing equipment and equipment for feeding different binders. These products have been developed in close collaboration with customers to provide solutions for problems faced specifically by earthmoving contractors, saving them time and reducing their operating costs.

As well as these solutions focused events, ALLU unveiled its latest development for the industry, based on many years' expertise and feedback from customers. The result of this knowledge and know-how is a solution for foundation, remediation and solidification work: ALLU PROCESSOR.

The ALLU PROCESSOR is a hydraulic attachment for excavators which may be used with any binder or together with any type of binder feeding system. This includes dry (powder) materials, wet (slurry) and air (blowing air instead of binder trough the binder feeding tube).

For more information, visit www.allu.net




Today's top stories

Florida's Sarasota Bradenton International Airport Sees $105M Terminal Expansion

Louisville Pump Station Receives $230M Update

Rokbak Haul Track Telematics Boost Uptime With Proactive Maintenance

SISO Air, InTerra Form Strategic Reseller Agreement

Hitachi Construction Machinery Wins Silver in 2024 Anthem Award

Balfour Beatty's Carolinas Operations Selected for Over $36M in Special Project Works

Caterpillar to Spotlight 'Next 100 Years' at CES 2025

Liebherr to Exhibit at World of Concrete 2025


 







\\ \\ \\