List Your Equipment For Free  /  Seller Login

Atlas Copco Launches SmartROC T Simulator

The simulator has a pre-designed learning pass to give students step-by-step instructions on operational best practices.

Thu April 10, 2014 - National Edition
Construction Equipment Guide


Atlas Copco is launching a new surface crawler simulator for operator training — the SmartROC T operator simulator.

The SmartROC T simulator uses the original controls identical to those on the drilling equipment. This provides students with a realistic training environment. The advanced control system also is integrated into the simulator, giving students the opportunity to use all the features of the actual drilling equipment.

Furthermore, the simulator has a pre-designed learning pass to give students step-by-step instructions on operational best practices. The simulator is mounted on a motion platform for a realistic experience.

The simulator is part of a new classroom training module that is easy to move around while still having a moving platform. The training can be done from the standard operator seat or from the original RRC control. All scenarios can be done in the dark so that all realistic environments can be trained.

A comprehensive training package also is offered to go with the simulator, the Master Driller program. This consists of three different levels (bronze, silver and gold) that take the operator from classroom training and simulator training to actual training on the drilling equipment.

For more information, visit www.atlascopco.com.




Today's top stories

Pacific Coast Highway Drainage Infrastructure, Bridge Construction Proceed

Explore St. Louis: Gateway to Experiences at World of Asphalt 2025

AUSA Unveils Its Next-Generation of Compact Dumpers

MassDOT Plans to Replace Cape Cod's Sagamore Bridge With Two, Three-Lane Spans

Caterpillar to Spotlight 'Next 100 Years' at CES 2025

HIPOWER HS Stationary Product Line

Appalachian State University in Boone, N.C., to Build $29M Indoor Athletic Practice Facility

Tennessee DOT Wants $308M in Funding to Deal With Backlog of Projects Amid Flat Revenues


 







\\ \\ \\