List Your Equipment For Free  /  Seller Login

Blue Smoke Control Eliminates Hot-Mix Asphalt's Odor-Causing Emissions

Wed April 21, 2021 - National Edition
Blue Smoke Control


Invisible emissions from plants — specifically, the odor-causing volatile organic compounds (VOCs) that reside in hot asphalt storage tanks — can create a number of challenges for producers, ranging from regulatory requirements to overt opposition from neighbors.
Invisible emissions from plants — specifically, the odor-causing volatile organic compounds (VOCs) that reside in hot asphalt storage tanks — can create a number of challenges for producers, ranging from regulatory requirements to overt opposition from neighbors.
Invisible emissions from plants — specifically, the odor-causing volatile organic compounds (VOCs) that reside in hot asphalt storage tanks — can create a number of challenges for producers, ranging from regulatory requirements to overt opposition from neighbors.
 X-VOCS incorporates a five-stage filtration system. In the first three stages, a series of filters remove more than 95 percent of targeted particulates down to 0.3 microns. In the final two stages, carbon filtration beds remove remaining odors and volatiles.

Blue Smoke Control, a division of Anaheim, Calif.-based Butler-Justice Inc., introduced X-VOCS, the company's newest system for eradicating odor-causing emissions produced as a byproduct during hot-mix asphalt production.

Invisible emissions from plants — specifically, the odor-causing volatile organic compounds (VOCs) that reside in hot asphalt storage tanks — can create a number of challenges for producers, ranging from regulatory requirements to overt opposition from neighbors.

The X-VOCS System features proprietary carbon absorption technology designed to filter and remove up to 99 percent of odors and VOCs, such as Hydrogen Sulfide (H2S), from tanks.

X-VOCS incorporates a five-stage filtration system. In the first three stages, a series of filters remove more than 95 percent of targeted particulates down to 0.3 microns. In the final two stages, carbon filtration beds remove remaining odors and volatiles. The X-VOCS system is ideal for new plants, and also is easily retrofittable into existing operations, with minimal modifications to the plant, according to the company.

Further, when the X-VOCS technology is coupled with the company's Blue Smoke Control system, emissions from hot-mix plants can be reduced to nearly zero, providing owners with the means to achieve the highest level of environmental stewardship. Implementation of this technology has been proven to virtually end calls from nearby neighbors regarding odor and visual emissions. Similar to X-VOCS, the Blue Smoke Control system is retrofittable with few plant modifications.

According to Mike Butler, president of Butler-Justice, "We worked for many years to solve the odor and VOC issues associated with asphalt production. The patent-pending technology of X-VOCS can stand on its own, but it also combines well with our industry-standard Blue Smoke Control system to reduce both odor and blue smoke, which are some of the most common causes of neighborhood and Air Quality Board issues."

Blue Smoke Control division of Butler-Justice Inc. is a leading supplier of complete blue smoke control and odor control systems that eliminate both the blue haze typically found during the production of hot mix asphalt, as well as odor-causing VOCs. With hundreds of successful installations in the continental United States and Hawaii, as well as Canada, Mexico, Australia and Europe, Blue Smoke Control achieves the highest standards of emissions control, with reasonable initial investment costs and economical ongoing expenses, according to the manufacturer.

For more information, call 714/696-7599 or visit www.bluesmokecontrol.com.




Today's top stories

Turner Construction Leads $675M Concourse Project

Prioritize Planned Maintenance to Get the Most Out of Your Machines

Depreciation Bonus Begins Phase-Out

National Attachments Celebrates Its 35th Anniversary

California's I-80 Pavement Rehab Project Moving Along

CEG Speaks With New President of Chadwick-BaRoss, Thompson Equipment

Boston, MBTA Officials Reveal New Designs for Future Blue Hill Avenue Transit Project

Ole Miss Progressing Toward Construction of $125M Accountancy School


 







\\ \\ \\