Construction Equipment Guide
470 Maryland Drive
Fort Washington, PA 19034
800-523-2200
Arkansas Tech University - Wed March 22, 2023
Arkansas Tech University to Start Work This Summer On New Student Union, Rec Center
Construction began in mid-March on a new student union and recreation center at Arkansas Tech University (ATU) in Russellville, the continuation of a process that was set into motion almost a decade ago....
UAPB News - Tue December 27, 2022
University of Arkansas at Pine Bluff Breaks Ground On New Student Center
A groundbreaking ceremony was held on the campus of the University of Arkansas at Pine Bluff (UAPB) Dec. 16 ahead of the start of construction on the school's new $33 million Student Engagement Center....
University of Arkansas - Tue November 15, 2022
Mullins Library at University of Arkansas to Undergo Major Renovation in January
The second of two phases of work to renovate the David W. Mullins Library on the campus of the University of Arkansas (UA) in Fayetteville will begin in January, the school announced Nov. 14. Built in 1968, Mullins Library is the main library facility at UA, where most of the University Libraries' central offices, study space and collections are located and available for public use....
LiuGong - Wed September 21, 2022
LiuGong North America Adds Crouse Equipment to Dealer Lineup
LiuGong North America welcomed Crouse Equipment as a new construction equipment dealer. The Sheridan, Ark.-based dealer is centrally located within the state. As a LiuGong construction equipment dealer, Crouse will sell both excavators and wheel loaders....
Northwest Arkansas Democrat-Gazette - Tue September 20, 2022
Arkansas Airport Plans to Use Cash for Terminal Expansion, Other Projects
A collection of federal grants and a change in how much cash is kept in reserve means the Northwest Arkansas Regional Airport Authority has a wad of cash for its proposed renovation of the Bentonville airport terminal, a committee heard Sept....
Cindy Riley – CEG Correspondent - Thu August 18, 2022
McGeorge Contracting Works to Complete King Expressway/Hot Springs Bypass Extension
In Garland County, Ark., construction crews are working diligently to complete a $78.5 million, 5.8-mi. extension of the King Expressway/Hot Springs Bypass from the U.S. Highway 70 East interchange to the junction of Arkansas Highway 5 and AR 7....
University of Arkansas - Mon August 15, 2022
Innovative Steel-Concrete Beam Tested at University of Arkansas by MIT Researcher
On a recent July day, representatives from the University of Arkansas (UA) and the Massachusetts Institute of Technology (MIT) gathered at the Harvell Civil Engineering Research and Education Center on the UA campus in Fayetteville to conduct a stress test on a concrete beam....
Arkansas Democrat Gazette - Tue August 09, 2022
Improvement Project On I-30 in Little Rock, Ark., Hitting Key Milestones
Construction on Interstate 30 in the Little Rock, Ark., area is set to soon reach several important mileposts as work continues on a flyover ramp, and a new bridge over the Arkansas River is opened. The developments are part of the $1 billion 30 Crossing project, designed to rebuild and widen parts of the thoroughfare to improve access in and out of downtown Little Rock and the city of North Little Rock, according to an Aug....
Fecon - Thu July 21, 2022
Fecon Appoints Power Equipment Company as Distributor in Arkansas
Fecon announced the addition of Power Equipment Company as a new stocking distributor of the full lineup of Fecon mulching tractors, forestry mulchers and attachments in the state Arkansas. Power has locations in Knoxville, Nashville, Kingsport, Chattanooga and Memphis, Tenn., Tupelo, Mississippi, and Little Rock and Springdale, Ark....
KTHV - Wed July 13, 2022
North Little Rock, Ark., Leaders Want Grant for Help in Replacing Crumbling Viaduct
A busy overpass in North Little Rock, Ark., has recently gotten some much needed attention as city officials have pushed for federal funding with hopes that they can avoid an infrastructure nightmare. Anyone looking underneath the 95-year-old Main Street Viaduct can see that the condition of the overpass is deteriorating, Little Rock television station KTHV reported July 7....
Today's Top Stories
Construction Equipment Guide
470 Maryland Drive
Fort Washington, PA 19034
800-523-2200
Construction Equipment Guide covers the nation with its four regional newspapers, offering construction and industry news and information along with new and used construction equipment for sale from dealers in your area. Now we extend those services and information to the internet. Making it as easy as possible to find the news and equipment that you need and want.
Contents Copyrighted 2024, by Construction Equipment Guide, which is a Registered Trademark, registered in the U.S. Patent Office. Registration number 0957323. All rights reserved, nothing may be reprinted or reproduced (including framing) in whole or part without written permission from the publisher. All editorial material, photographs, drawings, letters, and other material will be treated as unconditionally assigned for publication and copyright purposes and are subject to Construction Equipment Guide’s unrestricted right to edit and comment editorially. Contributor articles do not necessarily reflect the policy or opinions of this publication.
Read our privacy policy here.
Mastodon