List Your Equipment For Free  /  Seller Login

Massachusetts Bay Transportation Authority (MBTA)


Boston, MBTA Officials Reveal New Designs for Future Blue Hill Avenue Transit Project

The city of Boston and Massachusetts Bay Transportation Authority (MBTA) have released new conceptual designs for the Blue Hill Avenue transit project and announced plans to host three open houses in Mattapan and Dorchester in the coming month to vet the refined plan with neighbors and bus riders....


VIDEO: Feds Award Massachusetts $472.3M to Replace An Old Drawbridge Over Charles River

The Massachusetts Bay Transportation Authority (MBTA) will receive $472.3 million in federal funding to replace a Depression-era drawbridge over the Charles River, the agency announced Sept. 23The North Station Draw One Bridge connects Boston and Cambridge, carrying more than 11 million passengers per year on the Commuter Rail and Amtrak trains....


SPS New England, Select Demo Lead Boston Bridge Project

The Massachusetts Bay Transit Authority announced that the Dorchester Avenue Bridge in Boston is under construction. The bridge, which is located between Von Hillern and Kemp streets, was built in 1925 and rehabilitated in 1975....


Effort to Build a North South Rail Link in Massachusetts Backed by U.S. Rep. Seth Moulton

Seth Moulton has a mission: One day, people in Massachusetts will be able to travel by train, unimpeded, from Worcester to the North Shore. Or, if they are of a mind, from Needham to TD Garden in Boston....


Skanska Awarded $24M Contract for Supplemental Track Improvements to MBTA's Red Line

Skanska, a global construction and development firm, announced that it has been awarded a $24 million contract by the Massachusetts Bay Transportation Authority (MBTA) to provide supplemental track improvements to the MBTA Red Line during six 24/7 track outages scheduled in 2024....


VIDEO: Massachusetts Needs $24.5B to Repair a Multitude of Issues in State's Transit System

The Massachusetts Bay Transportation Authority (MBTA) said Nov. 16 that it needs $24.5 billion to fix the state's public transit system, WBZ-TV in Boston reported. MBTA admitted the staggering cost is needed to repair the multitude of issues it faces system wide....


Six-Week Shutdown of MBTA Green Line in Suburban Boston Delayed Until September

One of the newest stretches of the MBTA's Green Line Extension will remain open through the summer, the office of Massachusetts Gov. Maura Healey announced July 5. The news comes less than one week after the transit agency said the portion of commuter rail line would need to close for six weeks amid construction on the Squires Bridge....


Pedestrian Bridge at Natick MBTA Stop in Massachusetts Closed for Station Construction

The ongoing renovation and construction project at the Massachusetts Bay Transportation Authority's (MBTA) Natick Center commuter rail station is making progress, which means another closure is upon its riders....


Federal Grant Awarded to Hingham Ferry Dock Upgrades South of Boston

A $6.6 million Federal Transit Authority (FTA) grant recently was awarded to the Massachusetts Bay Transportation Authority (MBTA) for capital improvements to the ferry dock at the Hingham Shipyard, southeast of Boston....


New Rail Bridge to Be Built in Haverhill, Mass., Over Ongoing Construction

The Massachusetts Bay Transportation Authority (MBTA) has unveiled a new plan for the replacement of an old railroad bridge across Haverhill's South Elm Street that will primarily be built from a mid-air platform to prevent the potential chaos of simultaneous construction projects in that area of town....


Today's Top Stories

  1. California's I-80 Pavement Rehab Project Moving Along  →
  2. Clark Construction Breaks Ground On Forensic Hospital  →
  3. Balfour Beatty Begins $95.5M Mixed-Use Project in Dallas  →
  4. Raising I-95 in North Carolina's Coastal Plain  →
  5. CEG Speaks With New President of Chadwick-BaRoss, Thompson Equipment  →
  6. CPI Lands Lone Star Paving in Austin for $654M, 3M Shares  →
  7. Depreciation Bonus Begins Phase-Out  →
  8. Boston, MBTA Officials Reveal New Designs for Future Blue Hill Avenue Transit Project  →
  9. Silver Creek Materials: Stewards of the Earth in Texas  →
  10. Innovative Startups to Share Vision of Future of Construction, Mining at Hitachi Construction Machinery Challenge  →
  11. Stillwater Regional Airport Starts Work On $27M Terminal  →
  12. Work Is Under Way to Develop 84-Mi-Long Mountain Bike Trail in Rural Maine County  →
  13. Construction Has Begun On Innovative Proton Therapy Cancer Center in Connecticut  →
  14. VIDEO: Mecalac Introduces Multifunctional Compact Loaders With Foldable Canopies  →
  15. Bradley International Airport Near Hartford, Conn., Receives $6M to Make Improvements  →
  16. FEMA Grants $10M to Enhance Safety of Marlette Lake Dam Near Carson City  →
  17. Komatsu Introduces New WA700-8 Wheel Loader  →
  18. Ole Miss Progressing Toward Construction of $125M Accountancy School  →
  19. Pennsylvania Manufacturer Gives Major League Baseball All the Dirt  →
  20. VIDEO: KEMROC Expands; Plans to Increase Nationwide Presence  →
  21. Voters Approve $41B for State, Local Transportation Investment  →





\\ \\ \\