List Your Equipment For Free  /  Seller Login

Manitou Americas Releases All-New Edge Pickup/Hopper Broom Waterless Abatement System

Tue April 11, 2017 - National Edition
Manitou Group


Manitou Americas Pickup/Hopper Broom Waterless Abatement System
Manitou Americas Pickup/Hopper Broom Waterless Abatement System

Manitou Americas Inc. has added the EDGE Pickup/Hopper Broom with Waterless Dust Abatement System to its broom lineup for compact loader attachments.

The new EDGE Pickup/Hopper Broom with a Waterless Dust Abatement System is a cost-effective investment for contractors and rental houses. It provides excellent performance in milling applications, material pickup, parking lot, road maintenance and job-site cleanup. This unit works well for indoor application cleanup, as it features a “waterless” dust abatement system.

The new Pickup/ Hopper Broom with a Waterless Dust Abatement System features:

  • A large industrial filter, eliminating potentially large dust clouds
  • 12 volt shaker dislodges loose debris from the filter directly into the hopper
  • A slotted brush assembly allowing the brush to move vertically for ease of operation
  • A hydraulic cylinder that drops the bucket floor when dumping dirt and debris
  • Two caster wheels mounted on the side toward the front of the broom to prevent the user from rolling too far forward, preventing damage to the skirting and the frame

The EDGE Pickup/Hopper Broom with a Waterless Dust Abatement System comes complete with hoses and couplers as well as a bolt-on cutting edge to fit most compact loaders. This unit is available in 60”, 72” and 84” widths.

For more information, visit www.manitou-group.com




Today's top stories

SEPTA Builds Major Transportation Center

National Equipment League — Heavy Equipment Operation as a Professional Sport — Launches Season Two

Washington Bridge in Providence, R.I., Undergoes Demolition

Construction Industry Optimistically Preparing for New Year Ahead

Capital Express Central Project Ramps Up in Texas

Nevada DOT Awards $54M Contract for U.S. 50 Renovation in Ely

Construction Set for $37M Wildlife Crossing in Wyoming

PCL Construction's Special Projects Division Sets 2024 Record With Nearly 270 New Projects